-
-
$
Product Category: Feasibility Study
Product Code: 00005672
No of Pages: 12
No of Chapters: 8
File Format: Microsoft Word
Price :
$20
TABLE OF CONTENTS
1.0 Introduction………………………………………………………………………… 3
1.1 Executive Summary………………………………………………….…………. 3
1.2 Description Of The Location / Factory…………………………………. 3
1.3 Production Equipment / Capital Equipment………………………… 4
2.0 Monthly Depreciation Table……………………………………………….. 6
3.0 Production Process Techniques……………………………………………. 7
4.0 Production Capacity……………………………………………………………… 8
4.1 Production Cost……………………………………………………………………. 8
5.0 Sales Fore cast……………………………………………………………………... 11
6.0 Cost Forecast …………………………………………………………………….. 11
7.0 Operating Expenses…………………………………………………………….. 12
8.0 Profit And Loss Projection…………………………………………………… 12
1.0 INTRODUCTION
The propose company is to be registered, known and addressed as SOLID BLOCK industry, for both 6 inches and 9 inches concrete block production.
1.1 EXECUTIVE SUMMARY
The proposed project consists in establishing a concrete block industry in
The initial investment is at N9,633,868,
which includes equipments, working capital needs (including beginning
inventories), maintenance, salaries, advertisement and running cost.
1.2 DESCRIPTION OF THE LOCATION / FACTORY
SOLID BLOCK industry is located at km 145,
The major raw materials are:
1. THE SHARP SAND: Is the either ikorodu river sharp sand or any other high quality sharp sand of its kind
2. THE CEMENT: THE Obajama cement is one local cement depot of reliable quality of block production.
3. THE SOFT SAND: This will be gotten from the local sand market.
4. WATER: Water for production will be gotten from the well which is located within our site of production.
1.3 PRODUCTION EQUIPMENT / CAPITAL EQUIPMENT
SOLID BLOCK industry will make use of the following equipments for block production:
2 The Lister Machine 14 horse power (NISSAN)
3 The Vibrated Machine
4 The Vibrated Machine Mould
5 The pallet
6 The Barrow
7 The Shovel
8 A Small Office
9 A Well
10 A Small Desk-top Computer
11 Two Tables
12 Two Office Chair
13 Reception Chair
14 Account Book/ Stationeries.
facilitate writing of business correspondence to our customer
8. A WELL: This which will be dug in the site to avoid the stress of looking for
water during production. Also it is cheap and very affordable to dig a well.
9. 2 TABLES AND OFFICE CHAIRS:- These are required in the office.
10. RECEPTION CHAIR:- This is also require in the office for our customers
11. ACCOUNT BOOK/STATIONERIES:-This require for record keeping purpose though most of the documents are on the computer we need the book for back-up.
Click “DOWNLOAD NOW” below to get the complete Feasibility Study
FOR QUICK HELP CHAT WITH US NOW!
Buyers has the right to create
dispute within seven (7) days of purchase for 100% refund request when
you experience issue with the file received.
Dispute can only be created when
you receive a corrupt file, a wrong file or irregularities in the table of
contents and content of the file you received.
ProjectShelve.com shall either
provide the appropriate file within 48hrs or
send refund excluding your bank transaction charges. Term and
Conditions are applied.
Buyers are expected to confirm
that the material you are paying for is available on our website
ProjectShelve.com and you have selected the right material, you have also gone
through the preliminary pages and it interests you before payment. DO NOT MAKE
BANK PAYMENT IF YOUR TOPIC IS NOT ON THE WEBSITE.
In case of payment for a
material not available on ProjectShelve.com, the management of
ProjectShelve.com has the right to keep your money until you send a topic that
is available on our website within 48 hours.
You cannot change topic after receiving material of the topic you ordered and paid for.
No Review Found.
Login To Comment