DESIGN AND IMPLEMENTATION OF A COMPUTERISED STADIUM MANAGEMENT INFORMATION SYSTEM

  • 0 Review(s)

Product Category: Projects

Product Code: 00002904

No of Pages: 42

No of Chapters: 7

File Format: Microsoft Word

Price :

$12

ABSTRACT

 

          The accessibility, availability and reliability of data supporting management information system are important to the users in stadium management, just as the use of the internet and web technology is taking root in commerce, communication and so on.  The Internet and web technology in stadium management information system is expected to take root and deliver benefit to the management.

          This research work highlights the role computer information management system plays in the success of the operations of the stadium, allowing the organization stand the challenges posed by the individuals.

          Furthermore, this work examine the current status of stadium management in Nigeria, what it will take to make it successful and how data can be handled and maintained effectively.






TABLE OF CONTENT

 

Title page

Certification

Dedication

Acknowledgement

Abstract

Table of content

 

CHAPTER ONE

INFORMATION

1.1            Background of the study

1.2            Statement of the problem

1.3            Purpose of the study

1.4            Objective of the study

1.5            Scope of the study

1.6            Limitation of the study

1.7            Assumption

1.8            Definition of terms

 

CHAPTER TWO

LITERATURE REVIEW

 

CHAPTER THREE

OVERVIEW OF THE EXISTING SYSTEM

3.1            General description of the existing system

3.2            Method of data collection used

3.3            Objectives of the existing system

3.4            Organisational structure

3.5            Input analysis

3.6            Process analysis

3.7            Output analysis

3.8            Information flow diagram

3.9            Problem of the existing system

3.10       Justification for the new system

 

CHAPTER FOUR

DESIGN OF THE NEW SYSTEM

4.1            Output specifications and design

4.2            Input specifications and design

4.3            File design

4.4            Procedure chart

4.5            System flow chart

4.6            System requirement

 

CHAPTER FIVE

IMPLEMENTATION

5.1            Program design

5.2            Program flow chart

5.3            Pseudocode

5.4            Source program listing

5.5            Test run

 

 

CHAPTER SIX

DOCUMENTATION

6.1            System documentation

6.2            Program documentation

6.3            User documentation

 

CHAPTER SEVEN

CONCLUSION AND RECOMMENDATION

7.1            Conclusion

7.2            Recommendation

 

Bibliography





 

CHAPTER ONE

BACKGROUND OF THE STUDY


1.1     INTRODUCTION

The advent of computer Technology has brought relief to repetitive tasks and has helped in the better management and origination of data.  Information management system can be applied to any system that facilitates storage, management and retrieved of data and information required for some particular application within a computer system.  This makes it easier for data to be handled or managed.

The stadium staffs have been finding it so difficult to manage information for example, in the existing system where everything is processed manually,  the operators find it difficult to store, locate or retrieve information when necessary.  Also the issue of crowd control and ticketing, which is needed in events to generate income for the sector.  Processing ticket for an event manually can be costly, time – consuming and waste ticket stock which is always encountered in some event due to the excess ticket processed manually.

          The computer system can be used in so many ways in the stadium, for example, crowd control, processing of ticket for an event, managing office files and so on.

          This work concentrates on the computerized ticket, crowd control, information management in the stadium and facility management.  With the aid of computer system, the data will be properly managed, organized and construction of a suitable program that will help in the management of stadium.

 

1.2     STATEMENT OF THE PROBLEM

          Following the problem encountered in the organization, tickets that are processed for an event and the end, there will be left over (waste ticket stock) which create loss in the finance of the stadium unable to communicate with one another in other to share information which leads to time-consuming, re-entering of information and lack of centralized system for customer information.

 

 

 

1.3     OBJECTIVES OF THE STUDY

          This work is aim to reduce the work of stadium operators,  managers, and individuals.  Furthermore, the aim of this work it to.

(i)                study the present way of processing ticket.

(ii)             Design a new system that will be more convenient and efficient, which will take care of difficult encountered in the present system.

(iii)           Design a new system that will enable the organization control crowd in every events.

(iv)           Design a system that will make access to record or information easier.

 

1.4     SCOPE OF THE STUDY

          There are lot of activities that takes place in the stadium an example is the processing of ticket and management of information.  This research will base on a computerized management information system in the stadium.

 

 

 

1.5     LIMITATIONS OF THE STUDY

          The following constraints were experienced during the course of the research.

a        Time Constraint

          Due to the shortness of the semester and other activities within the school, there was no much time to carryout more research.

b        Lack of Money

          The issue of going from one place to another in search of materials relevant to the work calls the attention of monetary problems which limit the cost of this research.

 

1.6     SIGNIFICANCE OF THE STUDY

          The significance of this research is to help the staffs attain excellence, accurancy, and effectiveness in the data or information with aid of an information management system.

 

 

 

1.7            ASSUMPTION

The design of the system is assumed to be cost effective bt beneficial to stadium.  The design will reduce the problem facing staff or operators of the organization.

 

1.8     DEFINITION OF TERMS

Data – It is a law fact or it is an unprocessed information.

Information – They are data that has been processed and ready for use.

Management – It is the bringing together of resources and people for the

accomplishment of a specific goal.

Information Management – It is the organization and management of related

data within a system.

Information Retrieval – It is the method used in recovering specific information.

Maintenance – It is a way of taking care of facilities in an organization

Record – It is the collection of related fields raw data from within the

      organization.

Input – I is the capacity or collecting of raw data from within the organization.

Output – It is the transfer of processed information to the people or activities

      where it will be used.

Processing – This is the converting of raw data into a more meaningful form.

Information system – It is defined as a set of interrelated components that collect (or retrieve), process, store, and distribute information to support decision making and control in an organization.

Stadium – It is a place set aside for sport activities.

Click “DOWNLOAD NOW” below to get the complete Projects

FOR QUICK HELP CHAT WITH US NOW!

+(234) 0814 780 1594

Buyers has the right to create dispute within seven (7) days of purchase for 100% refund request when you experience issue with the file received. 

Dispute can only be created when you receive a corrupt file, a wrong file or irregularities in the table of contents and content of the file you received. 

ProjectShelve.com shall either provide the appropriate file within 48hrs or send refund excluding your bank transaction charges. Term and Conditions are applied.

Buyers are expected to confirm that the material you are paying for is available on our website ProjectShelve.com and you have selected the right material, you have also gone through the preliminary pages and it interests you before payment. DO NOT MAKE BANK PAYMENT IF YOUR TOPIC IS NOT ON THE WEBSITE.

In case of payment for a material not available on ProjectShelve.com, the management of ProjectShelve.com has the right to keep your money until you send a topic that is available on our website within 48 hours.

You cannot change topic after receiving material of the topic you ordered and paid for.

Ratings & Reviews

0.0

No Review Found.


To Review


To Comment