-
-
$
Product Category: Projects
Product Code: 00003003
No of Pages: 59
No of Chapters: 5
File Format: Microsoft Word
Price :
$20
ABSTRACT
This Project
Design and Implementation of Orientation Camp Information System (A Case Study
of NYSC Orientation Camp Awgu ) was designed to eliminate the problems
associated with manual handling of information at the Orientation Camp such as:
data redundancy, time wastage etc. The Design and Implementation was carried
out using the top down software development approach. The tools used to
implement this project are VB.Net and SQL Server.
|
|
|
TABLE OF CONTENTS |
|
|
|
||||
|
Title
page |
|
|
|
|
|
|
|
|
|
|
Certification
- |
|
- - |
- |
- |
- |
- |
- |
- |
i |
|
Dedication-
- |
- |
- |
- |
- |
- |
- |
- |
- |
ii |
|
Acknowledgement- |
- |
- |
- |
- |
- |
- |
- |
iii |
|
|
Abstract - |
- |
|
- |
- |
|
- |
- |
- |
iv |
|
Table
of contents- |
- |
- |
- |
- |
- |
-- |
|
v |
|
|
List of figures- |
- |
- |
- |
- |
- |
- |
- |
- |
viii |
|
List
of tables- |
- |
- |
- |
- |
- |
- |
- |
- |
ix |
|
CHAPTER
ONE |
|
|
|
|
|
|
|
|
|
INTRODUCTION |
|
|
|
|
|
|
|
|
|
1.1 |
Background
of the project- |
- |
- |
- |
- |
- |
1 |
|
|
1.2 |
Statement
of problems |
- |
- |
- |
- |
- |
- |
2 |
|
1.3 |
Objectives
of the project - |
|
- |
- |
- |
- |
|
2 |
|
1.4 |
Justification for the
project - |
- |
- |
- |
- |
- |
3 |
|
|
1.5 |
Scope of the project - |
- |
- |
- |
- |
- |
- |
3 |
|
1.6 |
Projects report
organization - |
- |
- |
- |
- |
- |
3 |
|
CHAPTER TWO
|
| LITERATURE
REVIEW |
|
|
|
|
|
|
|
||
|
2.1 An
overview of Nigeria youth service corps - |
- |
- |
5 |
|||||||
|
2.2 |
Operation
of the NYSC scheme - |
- |
- |
- |
- |
8 |
||||
|
2.3 |
Four phase programme of the
NYSC - - |
- |
- |
- |
9 |
|||||
|
2.3.1
Mobilization - - |
- |
- |
|
- |
- |
- |
- |
9 |
||
|
2.3.2 Orientation
Programme |
- |
- |
- |
- |
- |
9 |
||||
|
2.3.3
Primary Assignment |
- |
- |
- |
- |
- |
- |
10 |
|||
|
2.3.4 Community
Development Service- - |
- |
|
- |
11 |
||||||
|
2.3.5 Winding programme
and Passing out Parade |
- |
- |
12 |
|||||||
|
2.4 |
Orientation Process for
Prospective (NYSC) Members- |
13 |
||||||||
|
2.4.1 Orientation
course/Duration |
- |
- |
- |
- |
- |
13 |
||||
|
2.4.2 Registration- |
- |
- |
- |
- |
- |
- |
- |
14 |
||
|
2.4.3 Meal
ticket/feeding - |
- |
- |
- |
- |
- |
- |
15 |
|||
|
2.4.4 Accommodation on
camp- |
- |
- |
- |
- |
- |
15 |
||||
|
2.4.5 Orientation
Broadcasting service (OBS) - |
- |
- |
15 |
|||||||
|
2.4.6 Platoon and
platoon activities- |
- |
- |
- |
- |
16 |
|||||
|
2.4.7 Kit Items/ Mode
of Dressing- - |
- |
- |
- |
- |
17 |
|||||
|
2.4.8 Discipline- |
- |
- |
- |
- |
- |
- |
- |
- |
17 |
|
|
2.4 |
.9Security - |
- |
- |
- |
- |
- |
- |
- |
- |
18 |
|
2.5 |
ID Cards- |
- |
- |
- |
- |
- |
- |
- |
- |
18 |
|
2.5.1
Medical care - |
- |
- |
- |
- |
- |
- |
- |
18 |
||
|
2.5.2
Camp market- |
- |
- |
- |
- |
- |
- |
- |
19 |
||
|
2.5.3
Socials- |
- |
- |
- |
- |
- |
- |
- |
- |
19 |
|
|
2.5.4
Posting- |
- |
- |
- |
- |
- |
- |
- |
- |
19 |
|
|
2.5.5
Relocation- - |
- |
- |
- |
- |
- |
- |
- |
20 |
||
|
2.5.6
Exeat- |
- |
- |
- |
- |
- |
- |
- |
- |
20 |
|
|
2.5.7Religious
Activities at Orientation Camp |
- |
- |
- |
20 |
||||||
|
2.5.8
Corps Allowance - |
- |
- |
- |
- |
- |
- |
20 |
|||
|
2.5 |
.9 Prominent Activities
on Camp |
- |
- |
- |
- |
21 |
||||
|
CHAPTER
THREE |
|
|
|
|
|
|
|
|
||
|
SYSTEM
ANALYSIS AND DESIGN |
|
|
|
|
|
|||||
|
3.1 |
Methodology - |
- |
- |
- |
- |
- |
- |
- |
22 |
|
|
3.1.1
Methods of data collection |
- |
- |
- |
- |
- |
22 |
||||
|
3.2 |
Data Analysis |
- |
- |
- |
- |
- |
- |
- |
22 |
|
|
3.3 |
Analysis of the
existing system - |
- |
- |
- |
- |
23 |
||||
|
3.4 |
Limitations of the
existing system |
- |
- |
- |
- |
24 |
||||
|
3.5
system design - |
- |
- |
- |
- |
- |
- |
- |
24 |
||
|
CHAPTER
FOUR |
|
|
|
|
|
|
|
|
||
|
IMPLEMENTATION,
TESTING AND INTEGRATION |
|
|
||||||||
|
4.1 |
Choice of programming
language - |
- |
- |
- |
- |
31 |
||||
|
4.2 |
System
requirement - |
- |
- |
- |
- |
- |
- |
31 |
||
|
4.2.1
Software requirements - |
- |
- |
- |
- |
- |
31 |
||||
|
4.2.2
Hardware requirements - |
- |
- |
- |
- |
- |
31 |
||||
|
4.3 |
Implementation - - |
- |
- |
- |
- |
- |
- |
32 |
||
|
4.4.1
Unit testing - |
- |
- |
- |
- |
- |
- |
- |
35 |
||
|
4.4.2 System testing |
- |
- |
- |
- |
- |
- |
- |
38 |
||
|
CHAPTER
FIVE |
|
|
|
|
|
|
|
|
|
|
|
SUMMARY,
LIMITATIONS AND CONCLUSION |
|
|
|
|||||||
|
5.1 |
Summary |
- |
- |
- |
- |
- |
- |
- |
- |
39 |
|
5.2 |
Limitations of the
project - |
- |
- |
- |
- |
- |
39 |
|||
|
5.3 |
Bill of engineering
measurement |
and |
evaluation
- |
- |
40 |
|||||
|
5.4 |
Conclusion - |
- |
- |
- |
- |
- |
- |
- |
- |
40 |
BIBILIOGRAPHY
APPENDIX
A: PROGRAM
SOURCE CODE
APPENDIX
B: SAMPLE OUTPUT
APPENDIX
C: USER GUIDE
|
LIST
OF FIGURES |
|
|
|
|
|
|
|
|
|
3.1 |
The
NYSC Registration Form |
- |
- |
- |
- |
- |
27 |
|
|
3.2 |
The
Posting Form - |
- |
- |
- |
- |
- |
- |
28 |
|
3.3 |
The
System Flowchart |
- |
- |
- |
- |
- |
- |
29 |
|
3.4 |
The Top Down Design |
- |
- |
- |
- |
- |
- |
30 |
|
4.3.1
The NYSC Login Window |
- |
- |
- |
- |
- |
33 |
||
|
4.3.2.
Admin Form Window |
- |
- |
- |
- |
- |
- |
34 |
|
CHAPTER ONE
INTRODUCTION
1.1
BACKGROUND OF THE STUDY
The
national youth service corps (NYSC) is an organization set
1.2
STATEMENT OF PROBLEMS
The NYSC is faced with the following problems due to their manual method of handling information:
1.3 OBJECTIVES OF THE PROJECT
The objectives of this project are as follows:
1.4
JUSTIFICATION OF THE STUDY
The good reason why this project is done is to provide an efficient method of handling corps members’ data
1.5
SCOPE OF THE STUDY
This
project covers the design and implementation of information system for the NYSC
orientation camp (A case study of Awgu)
I.6 PROJECT REPORT ORGANIZATION
The project is organized as follows:
Chapter one of this project reports gives the detailed introduction of the project. Chapter two gives a review of the related literature. Chapter three covers the methodology, data collection, analysis of existing system, limitation of the existing system, system design, the database design, system flowchart and the top down design. Chapter four covers implementation, testing and integration. Chapter five gives the summary, limitations of the project, recommendation, bill of engineering measurement and evaluation (BEME) and conclusion.
Buyers has the right to create
dispute within seven (7) days of purchase for 100% refund request when
you experience issue with the file received.
Dispute can only be created when
you receive a corrupt file, a wrong file or irregularities in the table of
contents and content of the file you received.
ProjectShelve.com shall either
provide the appropriate file within 48hrs or
send refund excluding your bank transaction charges. Term and
Conditions are applied.
Buyers are expected to confirm
that the material you are paying for is available on our website
ProjectShelve.com and you have selected the right material, you have also gone
through the preliminary pages and it interests you before payment. DO NOT MAKE
BANK PAYMENT IF YOUR TOPIC IS NOT ON THE WEBSITE.
In case of payment for a
material not available on ProjectShelve.com, the management of
ProjectShelve.com has the right to keep your money until you send a topic that
is available on our website within 48 hours.
You cannot change topic after receiving material of the topic you ordered and paid for.
No Review Found.
Login To Comment