This
research work is titled “Inventory control and its impact on profitability” a
case study of Turners Building Product (Arewa) ltd
TABLE OF CONTENTS
Title page i
Approval ii
Declaration iii
Dedication iv
Acknowledgement v
Abstract vii
Table of contents viii
CHAPTER ONE
Introduction
1.1
Background
of the study 1
1.2
Statement
of the problems 4
1.3
Objectives
of the study 5
1.4
Significance
of the study 6
1.5
Scope
of the study 7
1.6
Research
questions 8
1.7
Historical
background of the study 8
1.8
Definition
of terms 9
CHAPTER TWO
Review of related literature
2.1
Definition
of inventory control 12
2.2
Importance
of inventory control 16
2.3
Control
of stock by values 22
2.4
Economic
order quantity (EOQ) model 24
2.5
Stock
levels 25
2.6
Material
requirement planning MRP 27
2.7
Cyclical
provisioning 29
2.8
Definition
of profitability 30
2.9
Reasons
for limiting the extent of profitability 32
2.10 Stock level and portability 35
CHAPTER THREE
Research methodology
3.1
Area
of the study 37
3.2
Research
design 37
3.3
Population
of the study 38
3.4
Sample
and sampling techniques 39
3.5
Instruments
for data collection 39
3.6
Administration
of the instruments 40
3.7
Techniques
for data analysis 40
CHAPTER FOUR
Data presentation and analysis
4.1
Presentation
of results 42
CHAPTER FIVE
Summary, discussion, conclusion and
recommendations
5.1
Summary
of procedure 52
5.2
Discussion
of findings 53
5.3
Implications
of the findings 54
5.4
Conclusion 55
5.5
Recommendations 55
5.6
Suggestion
for further studies 56
Bibliography 57
Appendix 58
CHAPTER I: Introduction
1.1 Background of the Study
Inventory control is an extension of stores keeping and it has been in practice for a long time. It has a wide scope of activities today. Inventory control is an act of safe keeping some valuable items for future use and to produce them when the need arises. Inventory control goes beyond the scope of keeping and producing the items only but also involves controlling of operations, receiving, quality control activities, training of store staff, control of all store houses, stock handling as well as clerical documentation.
Inventory control can be defined as
an art and science of achieving the objectives of inventory in an organization.
It involves planning, organizing, staffing controlling and co-coordinating all
the inventory operational activities for the provision of efficient services.
Inventory control is a serving centre and the services to be provided must be
meticulously handled, more organized to meet the demand of all units or
department that constitute the organization for optimum performance. The
primary function of inventory control is to provide for efficient inventory and
handling of goods to be redistributed to the ultimate user, this activity when
carried out with the use of Information Technology (I.T) will make re-ordering
of materials easy as the information are already in the computer. The use of
information technology in controlling of inventory eliminates time wastages.
This provision of services to the operating function must be fully appreciated.
All other activities although they have their own relative importance are
subordinate to this primary responsibility. The above central objective can be
analyzed as follows:
i.
To
make available a balance flow of raw materials components, tools, equipment and
any other item necessary to meet operational requirement.
ii.
To
provide maintenance materials spare part to general stores as required.
iii.
To
receive and issue work in progress and finished products.
iv.
To
accept and store scraps and other material as it arises.
v. To account for all receipt and issue of goods in the store.
Thus in any institution, private or
public, some substantial amount is spent on the acquisition of materials,
equipment etc. which are kept in the store house for future use. These items
represent an equivalent amount of cash and have to be looked after, protected
against unauthorized usage, until they are used for the intended purpose and
duly accounted for.
A lot of costs are associated with keeping of inventory despite that; we must however hold stock to meet production needs and sales needs. This is because if we do not hold stock in sufficient quantity we stand the risk of running out of stock and incurring all the cost associated with stock out. Therefore, for an organization not to have the above mentioned problem it is important that they strike a balance between carrying too much stock (over stocking) and carrying too little stock (under stocking). The importance of profitability cannot be overstated, because that is the reason why organizations are in business, if inventory control is carried out properly, there will be increase in production and sales thereby increasing profitability for the organization.
Therefore, this study attempts to
find out how inventory control can be effectively used to reduce time wastage,
theft, obsolescence and pilferage in the organization so as to achieve their
goals of profitability.
1.2 Statement of the Problem
Empirical research has shown that the study of inventory control or administration started late, unlike the study of other fields of human endeavour, such as medicine, engineering, and law, accounting and public administration to mention but few. This is not to say that it did not exist at all but this field has not attracted people as the belief that anybody can work in that area (inventory). Every year organization prepared and implements one type of economic policies/budget whereby a large sum of money is spent on acquisition of materials without making and adequate planned effort to provide for inventory facilities. These lapses coupled with improper stock control system and lack of trained personnel account for the ineffectiveness of inventory function in the public and private sector.
One is baffled to see that things bought for use such as capital equipment are left in the open during training reasons in which the outcome is usually deteriorated materials, a waste of effort and money.
Inventory control has problems in
general, especially in area of discrepancies, theft, fraud, obsolescence, deterioration
and breakages. All these constitute a great loss to the establishment coupled
with this, is also the problem of excess stock of some items with its affendant
consequences of tying down of capital in inventory. Thefts usually occur with
materials which are small in nature but of very high value. These materials are
usually stolen because there is no proper method of control. These problems are
not limited to a single establishment rather, they are universal problems still
facing many establishment.
1.3 Objectives of the Study
The aim of this study is to examine
the impact of inventory control on the profitability of Turners Building
Product (Arewa) ltd
1) To find out methods of operating
stores in a private sector, such as Turners building product (Arewa)
2) To determine whether inventory
control has help in increasing the profit of Turners
3) To advice the company in the method
adopted in inventory operations, if it is not consistent to the existing knowledge.
4) To find out how stock are kept in the
store house.
5) To identify factors that militates
against successful implementation of stock control system in the organization.
1.4 Significance of the Study
The significance of inventory control
in profitability covers various aspects of the organization as a result its importance
cannot be overlooked in particular the organization of Tuners Building Product
(Arewa)
The significance of compiling this research is to make researchers and historians who may need to know or get vital information about inventory control and it impact on profitability of Turner Building Product, and to give quick guide or easy access to the retrieval of information
The essence of this research work to
the organization is to enable them know more about what is going on in the
inventory control room, there problems and possible solution to tackle them. As
a problem solving topic, the researcher however, believes that the study will
help prospective inventory mangers to know more about this topic. It is also a
requirement in partial fulfillment for the award of Higher National Diploma in
purchasing and supply department.
1.5 Scope of the Study
The scope is limited to all aspect of
inventory control as it affects profitability of Turners Building Product
(Arewa) LTD
i.
What
is inventory control
ii.
The
importance of inventory control
iii. Control of stock by value
iv. The Economic Order Quantity (EOQ)
model
v.
Stock
level
vi. Material Requirement Planning MRP
vii. Cyclical provisioning
The scope will be restricted to the
purchasing, account and production department of Tuners.
1.6 Research Question
The research will be conducted base
on the following questions
1.
What
inventory control system is in use in the organization?
2.
Does
inventory control have any impact on profitability?
3.
Does
the organization keep proper store records for inventory control?
4.
Do
the organizations have adequate storage facilities?
5.
What
are the factors militating against successful implementation of stock control
system in the organization?
1.7 Historical
Background of
Turners Building Products (Arewa) limited also known as TBP (A) limited, started its production using one factory and producing building materials of various types these include roofing sheets made from asbestos and of different classes namely:- Big six corrugated sheets, standard corrugated sheets, Trafford tiles, self supporting sheets, ceiling beard popularly called flat sheets, (4x4 and 2x2) also made from asbestos, and also they produce interlocking stones.
The organization is made up of seven
(7) departments, and these are the general administrative, account, production,
maintenance, purchasing, audit and sales departments.
1.8 Definition
of Terms
For the purpose of this project, the
following terms are defined:
Code: a
process of assigning numbers, alphabets or combination of both for
identification purpose.
Deterioration:
a situation where items are becoming less of value or worse in quality.
Identification:
is the process of systematically defining and describing all items of inventory
held in the store.
Stock or inventory: are raw materials that have been purchased for use in the operation of
business semi-finished plants or partly processed raw materials awaiting
further processing, finished products that are awaiting distribution to
customers in warehouse at production site or in other location.
Issue/dispatch:
is the process of receiving demands selecting the items required and handling
them over to users.
Materials: are
components, spare parts, raw materials that are kept in the store houses.
Scrap: means
materials, products or replaced parts that have been used and no longer useful
to the organization.
Receipt: is
the process of accepting from all sources, all materials equipment and parts used
in the organization including supplies for manufacturing or operating process.
Inspection:
means the examination of incoming consignment for quality and quantity.
Obsolete: materials
that are out of date or use.
Obsolescence: materials
that are getting out of date or use.
Stores vocabulary: is a document in which all items held in the store are described.
Redundant: when
the quantity of an item in stock is more than is reasonably necessary to
provide an adequate service to the production or operational activity, the
excess over the normal holding is said to be redundant.
Buyers has the right to create
dispute within seven (7) days of purchase for 100% refund request when
you experience issue with the file received.
Dispute can only be created when
you receive a corrupt file, a wrong file or irregularities in the table of
contents and content of the file you received.
ProjectShelve.com shall either
provide the appropriate file within 48hrs or
send refund excluding your bank transaction charges. Term and
Conditions are applied.
Buyers are expected to confirm
that the material you are paying for is available on our website
ProjectShelve.com and you have selected the right material, you have also gone
through the preliminary pages and it interests you before payment. DO NOT MAKE
BANK PAYMENT IF YOUR TOPIC IS NOT ON THE WEBSITE.
In case of payment for a
material not available on ProjectShelve.com, the management of
ProjectShelve.com has the right to keep your money until you send a topic that
is available on our website within 48 hours.
You cannot change topic after receiving material of the topic you ordered and paid for.
No Review Found.
Login To Comment